5th Phase / TECHNICAL SPECIFICATIONS
- Structure – solid reinforced concrete
- Facade – combined
- External walls – gas blocks 250 mm – insulation
- Internal partitions – gas blocks 100 mm
- Floor – rough screed
- Wall finishing – plaster for final decoration
- Doors – aluminum, windows – aluminum with energy-saving double glazing
5th Phase / COMMUNICATIONS
- Ventilation and air conditioning system brought into the premises
- Electricity supply brought into the premises – 100 W per 1 m²
- Water and sewage supplied to common areas
- Heating – distributed with installed radiators
- Meters – electricity, water, heating
- Internet – brought into the premises
Location: