Premises №3 — 654 m² / 3rd phase

Phase 3 / Technical Specifications

 

  • Column grid – 12 x 24 m
  • Working height of the storage facility – 8 m
  • External walls and internal partitions made of sandwich panels with mineral wool thickness of 150 mm for external and 80 mm for internal walls
  • Floor with topping and dustproof coating with a load capacity of 3.5 t/m²
  • Dock gates with dock shelters, dock levelers, guides starting from a level of 1.2 m
  • Industrial sectional gates with a height of 4.3 m from ground level
  • Separate entrance metal-plastic doors
  • Skylights with a smoke removal system in the roof covering

 

2nd floor (mezzanine)

 

  • Located at a level of +4.9 from ground level
  • Floor – concrete floor with a rough screed
  • Stairs – prefabricated reinforced concrete or metal
  • Windows – metal-plastic with double-glazed windows

 

Phase 3 / Utilities

 

  • Electrical supply – cabling is installed in the premises
  • Water and sewage – connected to the premises
  • Heating:
    • in the warehouse – supplied to the premises without distribution
    • on the mezzanine – distributed with installed radiators
  • Fire protection systems – automatic sprinkler fire extinguishing system with a pumping station, gravity smoke removal system, notification system, dispatching system
  • Installation of meters: for cold water, electricity (multi-rate), for heating
  • Internet – connected to the premises

 

Location:

Генплан ПОРТ 2.0

Exterior photo
CONTACT US
Work schedule of the sales department:
Monday - Friday: 09:00 - 18:00
Saturday - Sunday: weekend
Mariia Skrut
Leasing Department Manager
+380 (67) 936 89 71
Olexii Shestak
Rental Department Manager
+380 (67) 936 89 71

    Order CALLBACK!

    Do you want our managers to contact you? Leave a request and we will call you back soon!